Latest News

Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update

POWERtrac successfully completes the installation of a 1600 KVA Substation and 2500A & 1600A Busbar Trunking (BBT) System at the Bashundhara Golf Driving Range (Golf Stadium) — marking a significant milestone in delivering reliable, high-capacity electrical infrastructure for one of Bangladesh's premier sports facilities.

For large-scale stadiums and sports complexes, uninterrupted and safe power supply is not optional — it's essential. With that priority at the forefront, POWERtrac's expert engineering team executed this project with precision, ensuring every component met the highest standards of safety, load calculation accuracy, and long-term operational reliability.

Key Highlights of the Project:

  • 1600 KVA Substation — Installed to handle the stadium's high power demand with efficiency and stability
  • 2500A & 1600A BBT (Busbar Trunking) System — Advanced trunking solution for structured, scalable power distribution
  • Safe & Precise Installation — Executed by certified professionals following strict safety protocols
  • Accurate Load Calculation — Ensuring optimal performance under peak and off-peak conditions
  • Long-Term Reliability — Built to support uninterrupted power for years of continuous stadium operations

At POWERtrac, every project goes beyond delivery. It is a commitment to excellence, accountability, and long-term performance — backed by cutting-edge technology and industry-leading standards.

This successful execution at Bashundhara Golf Driving Range further strengthens POWERtrac's growing portfolio of large-scale electrical infrastructure projects across Bangladesh's sports, commercial, and industrial sectors.